top of page
Wind Flow Cooling Dam for Data Center
Type
Adaptive Reuse
Location
Paldang Dam, Gyeonggi-do, Korea
Year
2025
Collaborators
-
This project reimagines the aging Paldang Dam as a circular architectural resource by integrating a large-scale data center instead of demolishing the existing infrastructure. Leveraging the dam's microclimate and river-generated airflow for passive cooling, the proposal minimizes construction waste while demonstrating how existing infrastructure can be adaptively reused for sustainable data center design.
bottom of page