top of page

SAYYOUNG CHANG

CV

Wind Flow Cooling Dam for Data Center

Type

Adaptive Reuse

Location

Paldang Dam, Gyeonggi-do,  Korea

Year

2025

Collaborators

-

This project reimagines the aging Paldang Dam as a circular architectural resource by integrating a large-scale data center instead of demolishing the existing infrastructure. Leveraging the dam's microclimate and river-generated airflow for passive cooling, the proposal minimizes construction waste while demonstrating how existing infrastructure can be adaptively reused for sustainable data center design.

정면투시도-수정.jpg
Re-Construct_2711_US_SAC_2.jpg
Re-Construct_2711_US_SAC_3.jpg
Re-Construct_2711_US_SAC_4.jpg
5.jpg
4.jpg
1.jpg
2.jpg
bottom of page